Howarth Kitchens

This project was carried out by our Leeds Branch and consisted of a kitchen, four bathrooms, and a utility room remodel. Modern kitchens are among our favourite kitchen designs, and this one encapsulated the modern idealism of bright, fashionable, and eye-catching.

The open-plan kitchen, designed to be a focal point for the entire house, includes cutting-edge appliances like an Insinkerator disposal system and a Quooker hot tap, which is a must-have for any kitchen!

The bathrooms include amazing tiles from Yorkshire Tiling Co., as well as traditional looking bathroom sinks and basins by Burlington.

“It’s always incredibly satisfying to know that you helped someone’s kitchen dreams come true just by integrating an enhanced and improved kitchen design with our dependable suppliers and appliances. And the client was very happy with the result – which is a bonus!” – David Bushby

The Plan

Large kitchens are particularly popular in designs right now, with many being built in preparation for the festive period. And it was precisely what this customer desired in terms of design – a space that was striking, welcoming, and spacious enough for a busy family.

The Result

As a result, the outcome of this project finished with a much brighter, more chic-looking kitchen with Contempo Glass & Meridian Granite. High-end appliances, such as an Insinkerator and a Quooker tap, were also installed. The final result was exactly what the customer desired, and they were pleased to finally have their dream kitchen become a reality.

Kitchen details

Share this project:

5/5

From the initial meeting with David to discuss possible kitchen layout options to the finished design, it has been a pleasure to deal with him and Leeds Howarth Kitchens. We would not hesitate to recommend Howarth in Leeds to anyone.

Kitchen

Outdoor Kitchen

Utility Room

Leeds

Address

Prince Edward Works,
Pontefract Ln,
Leeds LS9 0RA

Phone Number

0113 200 0100

David Bushby

SHOWROOM SALES MANAGER